All used cars › AUDI › SQ8

2022 AUDI SQ8 PRESTIGE

Used · Stock #14203 · VIN WA1CWBF13ND030854

Vehicle specifications

Year2022
Make / ModelAUDI SQ8
TrimPRESTIGE
Body typeSUV
Mileage26,483 mi
TransmissionA
Exterior colourRED
Interior colourBLACK
VINWA1CWBF13ND030854
Stock number14203

Features & options

  • Active Seatbelts
  • Alarm
  • All Wheel ABS
  • Daytime Running Lights
  • Dual Airbags Front Head and Side
  • Dual Rear Side Airbag
  • Immobilizer
  • Keyless Entry
  • Passenger Airbag Sensor
  • Tilt Wheel

Dealer notes

*BANG & OLUFSEN *SQ8 LUXURY PACKAGE *NIGHT VISION ASSISTANT *PRESTIGE PACKAGE *MATADOR RED METALLIC 2022 Audi SQ8 Prestige, finished in gorgeous Matador Red Metallic over a luxurious Black Valcona Leather interior. Blending exhilarating performance with sophisticated luxury and cutting-edge technology, this high-performance SUV delivers an unforgettable driving experience. Powered by a twin-turbocharged V8 engine, the SQ8 offers thrilling acceleration, confident handling, and the unmistakable presence that sets Audi's S models apart. The bold exterior styling is perfectly complemented by the rich Black Valcona Leather cabin, where premium craftsmanship and advanced technology create a first-class environment for every journey. As the flagship Prestige trim, this SQ8 comes exceptionally well-equipped with an impressive list of premium features, including the immersive Bang & Olufsen 3D Advanced Sound System, delivering concert-quality audio throughout the cabin. The rare Night Vision Assistant enhances confidence during nighttime driving by helping detect pedestrians and large animals beyond the reach of the headlights. Adding even more refinement, the desirable SQ8 Luxury Package elevates the cabin with premium comfort and upscale appointments, making every drive as relaxing as possible.

Asking price
$60,550

Download spec sheet (PDF)

Prices exclude tax, title, registration and dealer fees. Confirm the price and availability with the dealer before travelling.

Sold by

Ed Mullinax Ford
8000 Leavitt Rd
Amherst, Ohio 44001

Read reviews of this dealer on Dealer500

Ask about this vehicle

Similar vehicles